PV Powered 3000 Manual de Instalação Página 31

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 30
SMA Solar Technology AG Electrical Connection
Installation Manual SB25_30-IA-IEN115050 31
4. Push the cable gland toward the thread and fasten to a torque of 2 Nm.
The DC connectors are assembled and can now be connected to the inverter as described in
Section 5.4.4 "Connecting the PV Array (DC)" (page33).
If the conductors are not visible in the
hollow cavity, the cable is not in the correct
position.
Loosen the clamping bracket. For this
purpose, use a screwdriver with a blade
width of 3.5 mm.
Remove the cable and start again from
step 1.
Result Measure
Vista de página 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 75 76

Comentários a estes Manuais

Sem comentários