5 Commissioning the PV system 45
5.1 Status LEDs 46
5.2 Display and keypad 46
5.2.1 Components 46
5.2.2 Display layout 47
5.2.3 Keys 47
5.2.4 General menu structure 47
5.3 Inverter turn-on procedure 48
5.4 Inverter turn-off procedure 48
5.5 Standard initial commissioning 48
5.5.1 Brief overview of the commissioning steps 48
5.5.2 Detailed description of the commissioning steps 48
5.6 Setting values 50
6 Production Information 52
6.1 Overview 52
6.2 Current data 53
6.3 Other statistics 54
6.4 Deleting statistics 56
7 Settings 57
7.1 Overview 57
7.2 Installation settings 57
7.2.1 Date and time 58
7.2.2 Date and time formats 58
7.2.3 Contrast 59
7.2.4 Grid selection 59
7.2.5 RS-485 60
7.3 Grid feed-in settings 61
7.4 Options settings 62
7.4.1 Shading 62
7.4.2 AFCI setting 63
7.4.3 AFCI self test 64
7.4.4 Arc fault clear 64
7.5 Standard menu 65
8 Diagnosis and maintenance 66
8.1 Operating states 66
8.1.1 Types of operating states 66