
31
PVP250kW & PVP260kW Inverter
Installation & Operation Manual
Step 4: Upper Electronics Compartment
1. Check the integrity of the busbars and their connections in the upper electronics
compartment.
Figure 4-8 Checking the Busbar Connections
Step 5: Upper Active Cooling Compartment
1. Ensure that the fans spin freely.
Figure 4-9 Fan Inspection
2. Ensure all air lters are fully seated.
Comentários a estes Manuais