
43
PVP250kW & PVP260kW Inverter
Installation & Operation Manual
8 Circuit Option 16 Circuit Option 20 Circuit Option
8 Circuit with
Monitoring Option
16 Circuit with
Monitoring Option
Subcombiner with no Circuits
Figure 4-16 DC Subcombiner Configurations
9. Using a voltmeter, check the PV array positive leads and conrm the voltage is
positive when referenced to the negative leads. The reading should not exceed your
calculated series V
oc
total.
10. De-energize the DC cables.
11. Reinstall the protective plastic covers.
Comentários a estes Manuais